Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/sites/lloyd-thomas.co.uk/public_html/wp-includes/functions.php on line 6114 FARM COMPLEX - Warwickshire - LLoyd - Thomas Architects

FARM COMPLEX – Warwickshire

A complete refurbishment of a farm complex including renovation of the period Farmhouse, conversion of numerous barns and outbuildings, new build Entrance Hall, Swimming Pool and Tennis Court.

The quadrant shaped Entrance Hall was carefully inserted into the existing Courtyard.  The fully glazed timber framed panels are capped with a zinc roof, providing shelter with a generous overhang.

Lloyd-Thomas Architects provided a full-service including Design, Planning Permission, Building Regulations Approval, and on site Contract Management.